David the builder came today to construct the new wall to house the fridge and allow Mitchell to run top cabinets over the fridge.

As I mentioned in a previous post, David is also an electrician, and he was able to install power points on both sides of the new wall.

I had an early start, as I wanted to clear the area completely, including the cupboard where the itch box is.  It did not take long to push everything out of the way.  Luckily we have two doors to our bathroom/ensuite, and the fridge tucked in the lounge room doorway very neatly.

I was surprised that the floor underneath the “office” unit was quite clean.  The Roomba vacuum is able to get under there and has done a good job of it 🙂

Here is kitchen empty and ready for the day.

David arrived on time at 9:00am and told me that, due to the rain, he had not brought gyprock sheets today.  (Fair call😀)  He set about framing up the wall and was all done in a short while.

He then had a look at the electrical work he is doing and all seems good.👍

He is coming back on Wednesday to finish the boarding up and run the power.

Once David had gone, it did not take long to then put the fridge and furniture back in place and tidy again.